![]() |
||||||
|
|
||||||
|
||||||
Members LoginResources for British Columbia
Resources CanadaRelated Links
|
Web ArticlesClick here for printable version Re-piping or Epoxy Coating OCTOBER 22, 2002 - UPDATE Pursuant to the City of Vancouver seeking an Order in the Supreme Court of BC striking out the Claim please note the following highlights in point form from the Court decision of April 12, 2002; • The City of Vancouver (the "City") sought an order striking out the claim brought against it by the plaintiff on the ground that it discloses no reasonable claim. • The Cities of Richmond, New Westminster and Port Coquitlam and the Municipality of West Vancouver were represented by counsel at the hearing, but took no part in it and have no position with regard to the City's application. • The claim against the City was based on the assumption that the City has a duty of care to inspect for compliance of its code and that in breach of that duty the City has failed to require epoxy applicators to obtain permits, to insure that they are properly trained, to inspect plans and to inspect the work done. • The plaintiff says that it has lost re-piping contracts to epoxy coating contractors who have been allowed to operate unfairly without facing the costs of demonstrating compliance with the City's applicable codes. The plaintiff claims damages and declarations concerning what it alleges are the City's obligations with regard to epoxy contractors, as well as detailed injunctive relief. • The City points out, that the plaintiff is neither the owner nor prospective purchaser of property where epoxy pipe coating is used. The plaintiff is not a contractor working on such property. Rather the plaintiff is a contractor competing with epoxy pipe coating contractors and alleges only economic loss as a result of the City's alleged failure to enforce it's bylaws. • The City advanced the position that there is no duty on the City to protect the plaintiff from such loss resulting from its failure to regulate epoxy coating contractors as alleged in the statement of claim. The foreseeability of economic loss does not itself impose a duty of care to avoid such loss. • Justice Caitiff stated, “It is plain and obvious to me that the City does not and did not owe the plaintiff a private duty of care in the circumstances set out in the statement of claim. It follows that the statement of claim does not disclose a reasonable claim against the City.” • Justice Caitiff concluded “it is plain and obvious that the statement of claim discloses no reasonable claim against the City either on the basis of negligence or of other causes of action that have not been pleaded. Nor is there any basis for a claim to injunctive relief. The application is therefore granted, the plaintiff's statement of claim is struck out and the action is dismissed with costs.” • The future direction of this Action involving the other municipalities at this time is uncertain but any future events will be recorded as part of this article A Gamble or Sure Thing?The leaky condo syndrome has caused and continues to cause significant financial hardships for homeowners. While not as costly as the building envelope problem, the replacement of domestic water systems due to pre-mature failure of piping, undersized pipes or the expiration of the life cycle of pipes may be both costly and troublesome. Historically the replacement of the potable water distribution system involved retaining an engineer to design the replacement system and produce the specifications, then go to tender to obtain the best solution and price for the building in question. However, since 1999 British Columbia building owners have had another option to consider in resolving piping problems. Method one is the conventional method and is expensive, intrusive and a laborious. This process involves the entire removal and installation of new pipes for the potable water system. The piping is typically replaced using Type "K" copper pipe as it is the heaviest gauge copper piping available and 30% thicker than the Type "L" copper pipe which was likely originally installed. For a low rise building of 100 units with one 3 piece washroom and a kitchen sink the cost would be in the area of $2,400 - $3,000 per suite or in the range of $240,000 to $300,000 for a 100-suite building. At the end of the process the building will have an entirely new water distribution system. Method two involves the installation of an epoxy coating to the interior of the pipe carrying potable water. This method is advertised to work on all domestic water systems where the pipe is from 1/8 " to 6" in diameter. This method is quicker, cost less and not quite as intrusive. This process involves drying the pipes and the mechanical cleaning of the pipes using a sand and air mixture under pressure forced through the pipes. The epoxy coating is then applied by connecting the application equipment directly to the water tap fittings. Advertising material available suggests a possible cost saving from 35% to 40% as compared to the conventional methods of replacing the actual pipes described in method one above. Research pursuant to this article indicates that epoxy coating quotations are coming in at only 10% to 15% less than conventional re-piping. At the end of this coating process the old pipes remain but have been modified using the epoxy coating. Two questions immediately arise: The company filing the legal action is Cambridge Plumbing System , a plumbing contractor, whose primary business is the conventional retrofitting of potable water system. Cambridge Plumbing System is challenging the process and validly of the epoxy method as well as the lack of regulations governing the installation of the coating by epoxy coating contractors including staff training, staff supervision, permit approvals, inspections and performance requirements and failure of the Municipalities to enforce various building codes as applicable. The Defendants in the Action are the Cities of Vancouver , North Vancouver, Burnaby, New Westminster, Coquitlam and Port Coquitlam and Richmond, Corporation of Delta and the Municipally of Surrey and West Vancouver. The City of Vancouver, under the Vancouver Charter, is charged with enforcing the provisions of the BC Building Code as incorporated and amended by the Vancouver Building By-law number 8057. The remaining Municipalities are charged with enforcing the provisions of the BC Building Code including Part 7 that regulates the installation of plumbing systems including potable water systems. In the filed documents, the Plaintiff alleges that since 1999 epoxy pipe coating contractors have been coating the interior pipes of potable water systems. The Plaintiff further alleges that this activity has been carried out contrary to the provisions of the applicable building code. The Plaintiff alleges the following specifics of non-compliance by the epoxy coating contractors in jurisdictions regulated by the Municipalities (summarized): Additional concerns relating to the degree of skill, training and supervision in the installation of the epoxy coating were stated by the Plaintiff as follows: In general the Plaintiff alleges that the Municipalities failed to inspect the work done within their jurisdiction and failed to establish adequate criteria for the application of epoxy coating. As a result of this failure the Plaintiff cites lost piping contracts as the epoxy coating contractors are permitted to operate unfairly without incurring the costs of demonstrating compliance with the applicable code. The Plaintiff is also seeking the following Injunctions: The Plaintiff is also seeking General and Punitive Damages and Damages for economic loss plus Special and General Costs. Notwithstanding the potential merits of the "epoxy" solution, one primary concern is the lack of regulations, inspections, and performance standards for the epoxy coating solution and the training and supervision of the epoxy contractors. Again, as with the "leaky condo" syndrome it appears that the parties charged with exercising a duty of care to protect the public have not met minimum performance criteria. It is hoped that this matter be addressed as quickly as possible by the Municipalities involved to ensure we do not have another disaster in the making, similar to the faulty design and construction methods utilized which resulted in the leaky condo crisis.
The following articles were found in the category you selected:
Alternatively, you can access other areas of our website by clicking on the links directly underneath the logo to the left. |
|||||
|
Copyright © 2001 - 2006, Web Page Condominium News (WPCN) Inc. All rights reserved.
This site is owned and operated by Web Page Condominium News (WPCN) Inc. For technical issues only, contact the Webmaster |
||||||